Electrical (C-10) · Trade license

How do you get a C-10 electrical contractor license in California?

To get a C-10 electrical contractor license, you need four years of journey-level electrical experience in the last 10 years. You apply to CSLB ($450) and pass two exams: Law and Business and the C-10 trade exam. Then you file a $25,000 bond and pay the license fee (fees as of October 2026). Our C-10 deck is coming soon (get notified); Law & Business prep is available now for $99.

4 yrsJourney-level C-10 experience, within the last 10 years
2CSLB exams: Law and Business plus the C-10 trade exam
28%Planning and Estimating, the largest C-10 exam section
$25,000Contractor bond before CSLB issues the license
Step by step

What are the steps to a C-10 license?

To get a C-10 license, you qualify on experience, apply to CSLB, pass the Law and Business and C-10 exams at PSI, then file a bond and pay the license fee. Once CSLB accepts your application, you have 18 months to pass both exams.

  1. 1

    Check that you qualify

    You must be 18 or older and have a Social Security number or an ITIN. The qualifier needs at least four years of journey-level or higher experience in the C-10 classification within the last 10 years. What counts.

  2. 2

    Apply to CSLB

    File CSLB's Application for Original Contractor License (form 13A-1) for the C-10 classification, with the $450 fee. CSLB keeps the fee whether or not it approves the application. Someone with firsthand knowledge of your work certifies your experience.

  3. 3

    Wait for your Notice to Schedule

    When CSLB accepts your application, it mails you a Notice to Schedule. You then book and pay for each exam yourself with PSI, CSLB's testing vendor. CSLB also sends your fingerprinting instructions.

  4. 4

    Pass two exams

    C-10 applicants take Law and Business plus the C-10 trade exam, 3½ hours each, at $51.43 per exam to PSI (October 2026), on the same day or on different days. The C-10 exam is given only at PSI's 20 California centers and in Wilsonville, Oregon.

  5. 5

    Get fingerprinted

    The applicant and each officer, partner, owner, member, manager and responsible managing employee are fingerprinted for a DOJ and FBI background check. Processing fees are $49 ($32 DOJ plus $17 FBI), plus the Live Scan site's own fee.

  6. 6

    Complete the asbestos open-book exam

    Every new applicant must complete CSLB's Asbestos Open Book Examination before the license is issued. It does not certify you to do asbestos work.

  7. 7

    File your bond and workers' comp

    File a $25,000 contractor bond, or a $25,000 cashier's check instead. File proof of workers' comp if you have employees, or an exemption if you qualify for one, until January 1, 2028, when every active license except a joint venture with no employees needs coverage. Details below.

  8. 8

    Pay the license fee

    Pay the initial license fee: $200 for a sole owner or $350 for any other business type. CSLB then issues the license for two years.

The license

What work does a C-10 license cover?

A C-10 license covers electrical work of any kind. In CSLB's words, an electrical contractor “places, installs, erects or connects any electrical wires, fixtures, appliances, apparatus, raceways, conduits, solar photovoltaic cells or any part thereof” (16 CCR 832.10). Other licenses cover only part of that work.

Which CSLB licenses cover electrical work, from CSLB's classification text and the statute (checked 19 October 2026)
LicenseElectrical work it coversThe limit
C-10 ElectricalAny electrical wires, fixtures, appliances, apparatus, raceways, conduits and solar photovoltaic cellsNo voltage limit in CSLB's text
C-7 Low Voltage SystemsCommunication and low voltage systems that are energy limited, such as phone, sound, cable TV, closed-circuit video and low voltage landscape lighting91 volts or less; low voltage fire alarms are excluded
C-46 SolarThermal and photovoltaic solar energy systemsOther trades only when needed to install the solar system
B General BuildingElectrical work on a prime contract that requires at least two unrelated trades besides framing or carpentryNo electrical-only prime contract unless it holds a C-10 or subcontracts to a licensed specialty contractor
B-2 Residential RemodelingMinor alterations to existing electrical systems to install, repair or replace fixtures, on a contract with at least three unrelated tradesNo installing, replacing or extending electrical systems without the right license or a licensed subcontractor

Small jobs still count. You need a license for any job of $1,000 or more in labor and materials, and for smaller jobs that need a building permit or hired help (B&P 7048). More on the small-job rule.

Battery rules are not settled. A 2024 CSLB rule would add battery energy storage systems to the C-10 text and let a C-46 solar contractor install a battery only with a solar system, up to 80 kilowatt-hours. A court has stayed that rule while a San Diego County Superior Court case is decided, so CSLB's posted classification text above still applies. In September 2026, CSLB proposed a new C-46 rule that keeps the 80 kWh limit; comments are due November 23, 2026 (CSLB, Laws and Regulations).

Two different credentials

Is a C-10 license the same as DIR electrician certification?

No. The C-10 is CSLB's license for a business that contracts for electrical work. DIR's certification is for the people who do the electrical work for a C-10 contractor. The C-10's qualifying person needs no DIR certification (Labor Code 108.2(g)). The electricians the company hires must be certified, or be registered apprentices or trainees.

C-10 contractor license vs DIR electrician certification (checked 19 October 2026)
What to compareC-10 contractor license (CSLB)Electrician certification (DIR)
Who runs itContractors State License Board (CSLB)DIR's Labor Commissioner's Office for now. AB 1707, signed September 27, 2026, moves the program to CSLB once the Legislature funds it, on July 1, 2028, or one year after the funding, whichever is later
Who needs itA business that contracts for electrical work of $1,000 or more, or for smaller jobs that need a permit or hired helpPeople who work as electricians for a C-10 contractor (connections over 100 volt-amperes), unless they are registered apprentices or registered trainees
ExperienceFour years at journey level or higher in the C-10 classification, within the last 10 yearsOn-the-job hours: 8,000 for General Electrician, 4,800 for Residential Electrician, 2,000 to 4,000 for the three technician categories
ExamTwo CSLB exams at PSI: Law and Business, and the C-10 trade exam, 3½ hours eachOne exam for your category; General Electrician: 100 questions in 4 hours and 30 minutes
Books in the examNone: closed bookCode book and other references provided on screen
Passing scoreNot published by CSLB70%
Fees to start$450 application, $51.43 per exam, then a $200 or $350 license fee$75 application plus $100 exam: $175, not refundable
RenewalEvery 2 years: $470 sole owner, $720 other business types; no continuing education in CSLB's renewal stepsEvery 3 years: $100, with 32 hours of continuing education and 2,000 hours of work

Who must be certified, and who is exempt

Electricians who work for a C-10 contractor must be certified, unless they are registered apprentices or registered electrician trainees. A trainee must be registered with the Labor Commissioner, have completed or be enrolled in an approved curriculum, and work under the direct supervision of a certified electrician who supervises no more than one uncertified person.

The C-10's qualifying person is exempt. DIR says a C-10 licensee who works as another C-10 contractor's employee must be certified, and so must partners or officers who did not take the license exam.

Why C-10 contractors pay $20 more

Every active C-10 renewal carries an extra $20 that CSLB must use to enforce the electrician certification rules (B&P 7137). A C-10 contractor that willfully employs uncertified electricians can be disciplined, up to suspension or revocation of its license (Labor Code 108.2(h)).

Qualifying

How much experience do you need for a C-10?

CSLB requires at least four years at journey level or higher in the C-10 classification. The four years must fall within the last 10 years. Training, school or a completed apprenticeship can count for up to three of them. At least one year must be practical experience.

What counts as journey level

CSLB credits time as a journeyman, foreman, supervising employee or contractor. A journeyman is a fully qualified worker who can do the trade without supervision, as opposed to a trainee, helper, laborer, assistant or apprentice, or someone who completed an apprenticeship.

Years at CSLB, hours at DIR

CSLB counts years. The hour totals you see online are DIR's certification rules: 8,000 hours of on-the-job experience for the General Electrician exam and 4,800 for Residential Electrician. The two systems are separate.

Proof CSLB can ask for

If you worked for a C-10 contractor, CSLB's documentation list includes a copy of your Certified Electrician card, along with W-2 forms, pay stubs and your employer's contact information (13P-100, April 2026). The full list.

Who signs for your experience

A qualified person who saw your work firsthand certifies it, such as an employer, contractor, foreman, fellow employee, another journeyman or a union representative. Who can certify, and how.

The trade exam

What is on the C-10 exam?

The C-10 trade exam has five sections in CSLB's study guide 13E-10 (03/2026), for exams scheduled on or after June 1, 2024. Planning and Estimating (28%) and Rough Wiring (27%) make up more than half. The exam is closed book, multiple choice and 3½ hours long; CSLB publishes no question count and no passing score.

CSLB's C-10 exam outline, 13E-10 (03/2026). CSLB notes the percentages are approximate. Energy production and storage means photovoltaic, wind, generators, batteries and capacitors.
SectionWeightWhat CSLB lists under it
Planning and Estimating28%Existing system evaluation, plans and specifications, electrical calculations, code requirements, material selection, energy production and storage planning
Rough Wiring27%System layout, clearance and accessibility, raceway and panel installation, wire and equipment installation, grounding and bonding, energy production and storage rough wiring
Finish Wiring and Trim11%Device placement, motor and equipment installation, wire and equipment labeling, trims and sealants, energy production and storage finish wiring
Startup, Troubleshooting, and Maintenance16%Energizing and testing, common electrical problems, repair and replacement, testing equipment, energy production and storage performance
Safety18%Lockout/tagout, personal protective equipment, tools and equipment, hazardous materials and job site environments

How the exam runs

The C-10 exam is closed book: no reference materials may be used. Every question has four choices, some need math, and a calculator is provided. There is no penalty for guessing, and CSLB's guide says plenty of time is provided. You get 3½ hours, plus PSI's tutorial of up to 15 minutes, which does not count.

How to prepare for the C-10 exam

Use License Ladder as directed. Our Electrical (C-10) deck is coming soon: get notified when it launches. Every C-10 candidate also takes Law and Business, and License Ladder for Law & Business is available now for $99, so start there: study the printed cards and digital study guides, and work the app's practice questions and timed mock exams until your readiness score turns green. See the Law and Business question format in the free Law and Business practice test.

The other exam: Law and Business

C-10 applicants also take CSLB's Law and Business exam, which has seven sections, from business organization and licensing to safety, and is offered in Spanish. All seven sections and their weights.

Where you take it and what it costs

Book each exam with PSI for $51.43 (October 2026). The C-10 exam is given only at PSI's 20 California centers and its Wilsonville, Oregon site. If you fail, you can retake it after 21 days, inside your 18-month window. How retakes work.

Language

Can you take the C-10 exam in Spanish?

No. CSLB does not offer the C-10 Electrical exam in Spanish as of October 2026; at its December 11, 2025 meeting, CSLB said a translation is in progress but delayed by limited resources. You can take Law and Business in Spanish and ask CSLB to approve a translator for the C-10.

Law and Business in Spanish

Law and Business is one of the 10 CSLB exams with a Spanish version. If your exam has a Spanish version and you ask for a translator, CSLB requires you to take the Spanish version instead.

A translator for the C-10

For the C-10, CSLB may let a translator you choose read the exam to you, if CSLB approves the translator in advance. Ask exams@cslb.ca.gov for a Translator Form; review can take four to six weeks. Translators cannot bring dictionaries or explain terms.

Prepare for Law and Business in Spanish

At License Ladder, the site and the app run in Spanish, the cards are printed in Spanish, and the Exam Coach in the online system answers in Spanish. License Ladder for Law & Business is $99; our C-10 deck is coming soon (get notified).

Before the license issues

What bond and insurance does a C-10 contractor need?

Every active C-10 license needs a $25,000 contractor bond on file with CSLB. Workers' comp is required if you have employees; a C-10 with no employees can file an exemption, unless an RME qualifies the license, until January 1, 2028, when SB 1455 requires coverage for every active license except a joint venture with no employees. LLCs also need a $100,000 worker bond and liability insurance.

Bonds and insurance for an active C-10 license (checked 19 October 2026). RME means responsible managing employee.
RequirementWho needs itAmount
Contractor bondEvery active license (a cashier's check can replace it)$25,000
Bond of qualifying individualWhen the qualifier is not the owner, a general partner or a joint licensee, such as an RME; not needed for a corporation's responsible managing officer who owns at least 10% of the voting stock, or an LLC qualifier with at least a 10% membership interest$25,000
Workers' compNow: anyone with employees, and any license qualified by an RME. From January 1, 2028: every active license except a joint venture with no employeesA policy, or a certificate of self-insurance
LLC worker bondLLC licenses$100,000
LLC liability insuranceLLC licenses$1 million aggregate for five or fewer people listed, plus $100,000 for each additional person, up to $5 million

The C-10 is not one of the classifications that must carry workers' comp even with no employees. Those are C-8, C-20, C-22, C-39 and D-49 (CSLB, Workers' Compensation Requirements). More on the exemption.

Fees

How much does a C-10 license cost in CSLB, PSI and fingerprint fees?

A C-10 sole owner who passes both exams on the first try pays $801.86 in CSLB, PSI and fingerprint fees as of October 2026, or $951.86 for any other business type with one person fingerprinted; each additional officer, partner or member adds $49. That leaves out the Live Scan site's fee, the bond premium and insurance. The one C-10 difference is renewal: $20 more every two years.

C-10 CSLB, PSI and fingerprint fees as of 19 October 2026: first try on both exams, one person fingerprinted
FeeSole ownerOther business typesPaid to
Application (form 13A-1)$450$450CSLB
Two exams, $51.43 each$102.86$102.86PSI
Fingerprint processing (DOJ $32, FBI $17)$49$49Live Scan operator, plus the site's own fee
Initial license fee, good for two years$200$350CSLB
Total to get licensed$801.86$951.86CSLB, PSI and DOJ/FBI
Active renewal, every two years$470$720CSLB (includes the C-10's extra $20)

Veterans of the U.S. Armed Forces, including the National Guard or Reserve, who were not dishonorably discharged pay half the initial license fee: the law cuts it by 50% (B&P 7137). For every fee in every classification, see what a California contractor license costs.

FAQ

Questions people ask about the C-10 license

A C-10 license covers electrical work of any kind. In CSLB's words, a C-10 contractor “places, installs, erects or connects” electrical wires, fixtures, appliances, apparatus, raceways, conduits and solar photovoltaic cells (CSLB's C-10 classification, 16 CCR 832.10, checked October 2026). The text sets no voltage limit. That is the big difference from the C-7 low voltage license, which stops at 91 volts.

The C-7 covers only low voltage systems. They must be energy limited and no more than 91 volts, such as phone, sound, cable TV, video and low voltage landscape lighting. Low voltage fire alarms are left out (CSLB's C-7 classification, checked October 2026). The C-10 covers electrical work of any kind. Workers doing C-7 work for a C-7 contractor need no DIR electrician certification (Labor Code 108.2).

Yes, a C-10 contractor can install solar photovoltaic systems. CSLB's C-10 classification names solar photovoltaic cells. Four of the five C-10 exam sections include solar, wind, generator and battery systems, per CSLB's study guide 13E-10 (03/2026). The C-46 Solar license is a separate CSLB class. It covers only thermal and photovoltaic solar systems, and other trades only when a solar job needs them. CSLB's 2024 limits on C-46 battery work are on hold by court order (checked October 2026).

For electrical-only jobs, yes. A B General Building contractor can take a prime contract that includes electrical work when the contract requires at least two unrelated trades other than framing or carpentry. For an electrical-only prime contract, the B contractor needs a C-10 or must subcontract the work to an appropriately licensed contractor, per CSLB's Fast Facts on the B license (April 2025, checked October 2026).

Not from the state. Neither CSLB nor DIR issues a master electrician license. CSLB licenses electrical contractors with the C-10. DIR certifies the electricians who work for them, in five categories: general electrician, residential electrician, fire/life safety technician, voice data video technician and nonresidential lighting technician (Labor Code 108.2, checked October 2026). Electricians moving from another state must be certified before they start work for a C-10 contractor. DIR gives no grace period.

No. CSLB asks for four years of journey-level experience in the C-10 classification within the last 10 years, and you must pass the Law and Business and C-10 exams. CSLB's experience rules do not ask for DIR certification. After you are licensed, the C-10's qualifying person needs no DIR certification to do the work (Labor Code 108.2(g)). CSLB's Registrar told the Board the same in June 2026.

Anyone who works as an electrician for a C-10 contractor, unless they are a registered apprentice or a registered trainee (Labor Code 108.2, checked October 2026). A trainee works under a certified electrician's direct supervision. DIR says foremen who use tools must be certified. So must partners or officers who did not take the license exam, and C-10 licensees who work as another C-10 contractor's employees. Exceptions include the C-10's qualifying person, connections under 100 volt-amperes and work within a C-7 or C-45 license the same contractor holds.

CSLB counts years, not hours. A C-10 applicant needs at least four years at journey level or higher in the C-10 classification, within the last 10 years (CSLB, checked October 2026). A completed apprenticeship can count for up to three of those years. The hour totals you see online are DIR rules for certification: 8,000 hours on the job for General Electrician and 4,800 for Residential Electrician (DIR). What counts and who can certify it.

The C-10 exam has five sections, per CSLB's study guide 13E-10 (03/2026), for exams scheduled on or after June 1, 2024. Planning and Estimating is 28%. Rough Wiring is 27%. Safety is 18%. Startup, Troubleshooting, and Maintenance is 16%. Finish Wiring and Trim is 11%. Four sections include energy production and storage, such as solar, wind and batteries. CSLB says the percentages are approximate.

No. The C-10 exam is closed book. CSLB's C-10 study guide says no reference materials may be used, so you cannot bring a code book (checked October 2026). Each question has four choices, and a calculator is provided. DIR's electrician certification exam is different. Its July 2026 bulletin says the 2023 National Electrical Code and other references are on screen during that test.

CSLB does not say so. It does not publish a passing score for the C-10 exam. Its Get Licensed to Build guide says the percentage needed to pass “varies for each exam” (checked October 2026). The 70% you may have seen is DIR's minimum for its electrician certification exam, a different test (DIR bulletin, July 2026). A passing C-10 report does not show your score. A failing one does.

In fiscal year 2022/23, 49% of the 2,326 candidates who took the C-10 Electrical exam passed. That is from Table 8 of CSLB's 2023 Sunset Review Report, the most recent per-exam figures CSLB has published (checked October 2026). The three years before were 52%, 56% and 46%. CSLB calls these overall pass rates. It does not say whether they count first attempts only.

Yes, if CSLB approves the translator in advance. The C-10 Electrical exam has no Spanish version, so CSLB may let a translator you choose read it to you. Email exams@cslb.ca.gov for a Translator Form, and allow four to six weeks for review (CSLB Examinations FAQ, checked October 2026). Translators cannot bring dictionaries or explain terms. They cannot translate again for one year. The Law and Business exam has a Spanish version. More on translators.

Only with an Arizona electrical license held in good standing for the previous five years. Of California's five reciprocity states, only Arizona has electrical licenses that map to the C-10: its C-11, K-11 and L-11 (CSLB's Reciprocal Classifications List, checked October 2026). Nevada's C-10 is a landscaping license. It maps to California's C-27. Even with reciprocity, CSLB can still require the trade exam, and you still take Law and Business unless you passed it in the last five years. See every state's table.

Only at renewal. CSLB's application and initial license fees are the same for a C-10 as for other classifications. A sole owner who passes both exams on the first try pays $801.86 in CSLB, PSI and fingerprint fees (October 2026). Each active C-10 renewal, every two years, costs $20 more: $470 instead of $450 for a sole owner, per CSLB's fee list. By law, CSLB uses that $20 to enforce the electrician certification rules (B&P 7137).

CSLB lists none. Its renewal steps ask for the renewal form, the fee and a workers' comp recertification every two years (checked October 2026). An active C-10 sole owner pays $470, per CSLB’s fee list. Continuing education is a DIR rule for certified electricians. They renew every three years with 32 hours of continuing education, 2,000 hours of work in the industry and $100 (DIR).

Only with employees, for now. The C-10 is not one of the classifications that need workers' comp even with no employees (C-8, C-20, C-22, C-39 and D-49). So a C-10 with no employees can file an exemption, unless a responsible managing employee qualifies the license (CSLB, checked October 2026). From January 1, 2028, SB 1455 requires coverage for every active license except a joint venture with no employees. More on the exemption.

Not yet: the License Ladder Electrical (C-10) deck is coming soon, and you can get notified when it launches. Every C-10 candidate also takes CSLB's Law and Business exam, and License Ladder for Law & Business is available now for $99, so start there. It has the printed 142-card deck, digital study guides and one year of the app. Use it as directed until your readiness score turns green.

Start with the exam every trade takes

Our Electrical (C-10) deck is coming soon. Law & Business, which every trade also takes, is ready now: the printed 142-card deck, digital study guides and one year of the app, for $99. Use it as directed until your readiness score turns green. Get notified when the C-10 deck launches.

Enter your name and email to access the free demo. No credit card.

15 free cards on the App Store.

Sources

Where every fact on this page comes from

We fetched and read each source below on 19 October 2026. CSLB revises its pages and forms; if anything here differs from CSLB’s own wording when you read it, CSLB’s governs.